Kedalaman Maksimum
45.00 m
Dasar spudcan (d)
Kapasitas Maksimum
255.72 MN
Governing Capacity (Qv,max)
Potensi Punch-Through
2 Zona
Lapisan 2 (Sand) & Lapisan 4
Status Validasi
PASS (< 2%)
Deviasi Max: 0.00%
Geometri Spudcan & Opsi Analisis
m
m
m
m
Profil Lapisan Tanah (Soil Profile)
15 Lapisan| # | Kedalaman (m) | Jenis | φ (°) | Cu Top-Bot (kPa) | γ' | Aksi |
|---|
Clay: Cu (kPa) | Sand: φ (°) | γ': Berat jenis efektif (kN/m³)
Kurva Penetrasi Spudcan: Qv vs d
Bearing Capacity Qv (MN) vs Spudcan Base Penetration Depth d (m)
Lapisan
Menghitung Kapasitas Penetrasi...
Garis Merah: Governing Capacity (Qv,gov)
Garis Abu-abu/Hitam: General Shear
Margin Error vs Benchmark: 0.00%
Tabel Hasil Analisis Penetrasi
(0 titik)| Depth (m) | Spudcan d (m) | Lapisan | Tanah | Overburden (kPa) | Failure Mode | Qv,gov (MN) | Qv,GS (MN) | Qv,SQ (MN) | Qv,PT (MN) |
|---|